

Cost
Turn-key, and fully installed for less than $200k.
Appliances, architecture, permitting, survey, foundation and utility connection are likely extra.
Altogether - likely $350k+.
Construction Mess
Every piece of our units come pre-assembled and cut to exact specifications. No heavy machinery, no loud noise, minimal disturbance.
You will need a demolition bin at your house collecting refuge for the entire project. Heavy equipment, noise pollution, lots of dust, lots of debris.
Fit to Finish
Every piece is pre-engineered to fit perfectly.
Raw materials arrive and your contractors cut them per the drawings. This process is prone to errors, with cutting and sizing completed on site.
"Headache" Factor
Construction is disruptive and frustrating.
We've designed the Atella process so we do all the heavy lifting - all while your dedicated Atella guide answers your questions in real time.
You will have to coordinate between your architect, contractors, city planners and trades – all with different timelines and schedules.
Do you have the time?
Construction Team
Our construction partners are experts in their field, have decades of experience and are expertly trained to build an Atella.
Large installation team, including sub-trades unfamiliar with garden homes.
Delivery Time
On Time. On Budget.
Uncertain delivery windows.
Turn-key, and fully installed for less than $200k.
Appliances, architecture, permitting and foundation/utility connections are likely extra.
Altogether - likely $350k+.
Our units come pre-assembled and cut to exact specifications.
No heavy machinery, no loud noise, minimal disturbance.
You will need a demolition bin at your house collecting refuge for the entire project.
Heavy equipment, noise pollution, lots of dust, lots of debris.
Every piece of an Atella is pre-engineered to fit perfectly. No cutting, sawing or on-site adjustments.
Raw materials arrive and your contractors cut them per the drawings. This process is prone to errors, with cutting and sizing completed on site.
Construction can be disruptive and frustrating.
We've designed the Atella process so we do all the heavy lifting - all while your dedicated Atella guide answers your questions in real time.
You will have to coordinate between your architect, contractors, city planners and trades – all with different timelines and schedules.
Do you have the time?
Our construction partners are experts in their field, have decades of experience and are expertly trained to build an Atella.
Large installation team, including sub-trades unfamiliar with garden homes.
On Time. On Budget.
Uncertain delivery windows.
Permit Preparation and Permit Fees.
Land and Topographical Surveys.
All Required Engineer and Architectural Stamps.
Excavation and Foundation.
Utility Connection.
Atella Assembly.
Multiple Warranties on all of our Work - Including Tarion!
All items are included in our price!
Full GE Stainless Steel Appliances.
Samsung Washer/Dryer.
Complete Suite of Cabinets and Custom Millwork.
Lighting Fixtures.
Plumbing Fixtures.
Quartz Countertop and Backsplash.
HVAC system.
Move in ready!
There’s always extra costs in construction - but not with Atella.
Our price is our price, nothing more nothing less.
If you have unique site conditions (like tree removal or garage demolition), we will identify them and price them out in advance. Otherwise, our contract is a fixed price that you can count on.
Atella has been carefully designed by professional architects and interior designers.
No boring units with vanilla interiors. Instead, our units are modern, beautiful with efficient floorplans.
We deliver an Atella to you in approximately 120 days from the time you sign our contract.
On time, on budget.
Take advantage of government initiatives of up to $50,000 towards your Atella.
Find a list of initiatives here.